Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 43 results ...

Abuhussain, M (2020) An assessment of the Saudi Residential Buildings Envelope Code under the current and future climate change scenarios: the case for Jeddah in the hot and humid climate region, Unpublished PhD Thesis, , University of Liverpool.

Akade, S A (2017) Understanding the impact of culture on project execution in a developing country: an action research study of six international oil and gas companies in Nigeria, Unpublished PhD Thesis, School of Management, University of Liverpool.

Akinnola, P (2021) Improving project performance on construction projects through stakeholder management-an action research inquiry, Unpublished PhD Thesis, , University of Liverpool.

Aksenova, G (2020) The dark side of ecosystem orchestration: an empirical investigation of building information management in the digital built environment sector, Unpublished PhD Thesis, , University of Liverpool.

Al Hawsah, M O (2020) The impact of project sponsors' decisions on the success of projects: An action research study, Unpublished PhD Thesis, , University of Liverpool.

Al-Ashaikh, M H (1996) Project management in the public sector of Saudi Arabia, problems and solutions, Unpublished PhD Thesis, , University of Liverpool.

Al-Gathafi, M M (2005) Riskness of time and cost overruns and the effectiveness of risk response measure strategies in the Libyan construction industry, Unpublished PhD Thesis, Department of Architecture and Building Engineering, University of Liverpool.

Al-Hachami, Z (2020) Decision making in the oil and gas construction project management: structured VS discretionary, Unpublished PhD Thesis, , University of Liverpool.

Al-Omari, T (2004) Stochastic regression modelling of cost and duration overrun of construction projects implemented in Kuwait, Unpublished PhD Thesis, Department of Architecture and Building Engineering, University of Liverpool.

Alattyih, W (2015) Value creation and risk assessment for green building design in Saudi Arabia, Unpublished PhD Thesis, , University of Liverpool.

Aljarman, M (2016) Emerging risk from the application of building information modelling through the life cycle of projects, Unpublished PhD Thesis, Department of Architecture, University of Liverpool.

Alzaed, A (2012) User centered passive building design, Unpublished PhD Thesis, School of Architecture, University of Liverpool.

Alzahrani, A (2015) Uncovering the emerging risks from climate change scenarios and related climate change risk management in the building sector in the UK, Unpublished PhD Thesis, , University of Liverpool.

Alzahrani, S (2015) Dynamic simulation of the impact of risk events and risk cost in KSA PPP projects, Unpublished PhD Thesis, School of Engineering, University of Liverpool.

  • Type: Thesis
  • Keywords: complexity; construction project; effectiveness; life cycle; partnership; probability; regression analysis; risk management; Saudi Arabia; value for money
  • ISBN/ISSN:
  • URL: http://livrepository.liverpool.ac.uk/2013619/
  • Abstract:
    The majority of risk events in Public Private Partnership (PPP) projects are due to the complexity of these projects. It requires the best of risk allocation to the appropriate party that is able to manage and control the allocated risks in order to achieve best value for money. Many researchers stated that the influence of a risk might trigger another risk event. Sterman (1992) identified that large-scale projects are complex and they have extremely dynamic and interdependent risks and uncertainties over their life cycle. Williams (2002) also state that in a large scale construction project the risk generally interact with each other in a nonlinear manner over time. Investigating the interaction between risk factors can help to decrease uncertainties. Dey and Ogunlana (2004) state that there it is necessity to analyse the interactions between risk events in complex projects. In recent approaches to risk management in PPP projects, experts tend to consider risk factors as being independent and ignore the influence of interaction between risk events over the project life cycle. This undermines the effectiveness of project risk estimation. In this work, further investigation on the interaction between risk factors and their impact on the risk cost in PPP projects will be investigated in Saudi Arabia based on first hand data collected from practitioner working in the kingdom. A questionnaire was designed and sent to a representative set of 250 practitioners in the field of Saudi PPP projects. 68 practitioners completed and returned the questionnaire with a 27% response rate. The collected data was pre-processed, processed and analysed using the Statistical Package for the Social Sciences (SPSS). Using this statistical tool, regression analysis was carried out to build the equation of impact of risk events in each risk category. After that, the BestFit software was used to find best probability distribution fit for each risk factor. In This study, a new modelling approach for mapping risks and analysing the impact of risk events interaction considering the best distribution fit for each risk factor is developed using System Dynamics (SD) techniques (VENSIM software). This proposed model can help to estimate outturn construction unit cost of PPP projects and risk cost that is influenced by risk events interaction. Based on comprehensive prototyping and validation, the proposed approach is found to be robust valid tool for addressing real impact of risk events and evaluating the expected risk cost, which can help to improve risk allocation in PPP projects.

Bassanino, M N (1999) The perception of computer generated architectural images, Unpublished PhD Thesis, , The University of Liverpool (United Kingdom).

Binsarra, F A (2016) Uncovering the structure and the dynamic of information propagation in building, Unpublished PhD Thesis, School of Architecture, University of Liverpool.

Blyth, K A (2002) A computer model that forecasts the cash flow of building projects at the tender stage using stage payments, Unpublished PhD Thesis, School of Architecture and Building Engineering, University of Liverpool.

Elhag, T M S (2004) Tender price modelling: artificial neural networks and regression techniques, Unpublished PhD Thesis, School of Architecture & Building Engineering, University of Liverpool.

Evans, R C (2002) Dynamic cash flow forecasting model for construction contractors, Unpublished PhD Thesis, Department of Architecture and Building Engineering, University of Liverpool.

Feldbauer, R R (2019) Mindful project management: a framework to enhance underperformance managing large hospital builds by incorporating principles adapted from High Reliability Organizations, Unpublished PhD Thesis, School of Management, University of Liverpool.

Gee, S (2019) The development of an innovative, lean, mobile factory system to manufacture timber frame closed panels in temporary locations for use in the Assembly of Houses in the Affordable Rented Sector, Unpublished PhD Thesis, School of Architecture, University of Liverpool.

Gholami, E (2017) Exploiting BIM in energy efficient domestic retrofit: evaluation of benefits and barriers, Unpublished PhD Thesis, Department of Architecture, University of Liverpool.

Gkeredakis, E (2009) Explaining the distinctiveness of coordination through an in-depth study of a major construction project, Unpublished PhD Thesis, Management School, University of Liverpool.

Hepworth, A (2021) Decision-making in immature projects organisational environment: A mental model approach that influences conscientious critical thinking, Unpublished PhD Thesis, , University of Liverpool.

Ibrahim, A M (2019) A method to support leadership effectiveness in a construction project organisation in Nigeria, Unpublished PhD Thesis, School of Management, University of Liverpool.

Jervis, E (2015) Lowering CO2 emissions: a framework for overcoming institutional pressures and diffusing low carbon strategy throughout the construction supply chain, Unpublished PhD Thesis, School of Management, University of Liverpool.

Khodadadyan, A (2021) Living and future tools for risk assessment: an examination of the possibilities for fusion, Unpublished PhD Thesis, , University of Liverpool.

Kirkham, R J (2002) A stochastic whole life cycle cost model for a national health service acute care hospital building, Unpublished PhD Thesis, , University of Liverpool.

Kori, S i (2017) BIM business value creation for SME architectural firms in Nigeria using intellectual capital development, Unpublished PhD Thesis, School of Architecture, University of Liverpool.

Makwiranzou, C (2019) Building trust and managing risk between the client, consultant, and contractor in traditional and relational construction projects, Unpublished PhD Thesis, School of Management, University of Liverpool.

Morton, R R (1982) The speculative housebuilding industry in the nineteen seventies, Unpublished PhD Thesis, School of Architecture, University of Liverpool.

Munir, M (2020) Development of a building information modelling asset value realisation model, Unpublished PhD Thesis, School of Architecture, University of Liverpool.

Nizam Shaikh, R (2019) BIM-based investigation of total energy consumption in delivering buildings as a product, Unpublished PhD Thesis, , University of Liverpool.

Raimi, T (2017) Achieving customer satisfaction in a private housing organisation in Nigeria, Unpublished PhD Thesis, , University of Liverpool.

Salih, A (2020) Project management information system introduction: Challenges and remedies in a construction context, Unpublished PhD Thesis, , University of Liverpool.

Savva, C (2023) Lessons that can be learnt using action research strategies within TfL, Unpublished PhD Thesis, , The University of Liverpool (United Kingdom).

Sujan, S F (2020) A holistic and systemic model of collaboration in the AED industry, Unpublished PhD Thesis, , University of Liverpool.

Sutton, R M (2019) The development of a sustainable construction design process, Unpublished PhD Thesis, School of Engineering, University of Liverpool.

Tomlinson, J (1998) A premises occupancy cost forecasting model, Unpublished PhD Thesis, , The University of Liverpool.

Wanous, M (2000) A neurofuzzy expert system for competitive tendering in civil engineering, Unpublished PhD Thesis, Department of Architecture and Building Engineering, University of Liverpool.

Wellings, F (2005) The rise of the national housebuilder: A history of British housebuilders through the twentieth century, Unpublished PhD Thesis, , University of Liverpool.

Xi, J (2013) Evaluating the functional performance of small-scale public demountable buildings, Unpublished PhD Thesis, , University of Liverpool.

Zou, Y (2017) Building information modelling and knowledge-based risk management system, Unpublished PhD Thesis, School of Engineering, University of Liverpool.